Exceptional and Accurate CAD to BIM Services for a Prestigious Commercial Office Building

Clove Technologie's precise CAD to BIM services enabled seamless project execution and enhanced facility management for a 100,000 square meter commercial office building.

Introduction

Clove Technologies is proud to present a detailed case study detailing our exceptional and precise CAD to BIM services provided for the completion of a prestigious multi-storied commercial office building. This 100,000 square meter commercial property, boasting 20 floors, large basements and extensive mechanical plant areas, is a testament to our expertise and commitment to delivering high-quality results.

PROJECT INFORMATION:
Client: Owners
SERVICE: mechanical electrical plumbing
INDUSTRY: Commercial
Software Used:

Revit
Revit

Project Overview

The project involved creating an As-Built BIM model, which significantly aided the construction team in achieving their project targets. The As-Built BIM model was crucial for accurate planning, execution and management of the construction processes. This model ensured that the building was constructed as designed, with precise documentation of all architectural, structural and MEP services, facilitating seamless project execution and coordination.

Scope of Work

Architectural and Exposed Structural Elements:

Our team performed extensive and thorough modeling of the entire architectural interior, including exposure and detailing of structural elements. This process ensured exceptional accuracy and attention to detail, reflecting our dedication to the highest architectural design and execution.

MEP Services

The project entailed detailed modeling of Mechanical, Electrical and Plumbing (MEP) systems at a Level of Detail (LOD) 500, encompassing both interior and exterior elements. This included precise specifications and configurations for components, ensuring accurate and coordinated representations that facilitate construction and maintenance processes.

Basement Plant Areas:

The large plant areas in the basements were modeled in 3D, capturing the existing mechanical equipment and other plant rooms like STP & WTP Pump Rooms and Electrical & Generator Rooms, which run through risers and spread into the floors.

Asset Data for Facility Management

Our team also incorporated complete asset data into the BIM model, which was essential for the facility management phase. This data included detailed information on the building's components, equipment specifications, maintenance schedules and operational guidelines. By integrating this data, we provided a valuable resource for ongoing building management and maintenance, enhancing the building's operational efficiency and longevity.

Collaboration and Workflow

Our team worked closely with the surveying team, using their expertise to manage the complexities of the large dimensions of the property. This synergy ensured that we achieved the project timelines with utmost efficiency and effectiveness.

Technology and Expertise

With the proficient utilization of advanced software, we not only met but surpassed our client's expectations, achieving their digitalization objectives with precision and excellence.

CHALLENGES

Software Utilized:

Autodesk Revit: Utilized for the creation of complex and precise BIM models
Recap: Utilized for capturing and processing reality data.
NavisWorks: Employed for thorough project review and coordination.

Outcomes and Benefits

The creation of the As-Built BIM model provided numerous benefits, including.

Optimized Costs and Resources

The digital model helped our client optimize costs and allocate resources more efficiently.

Enhanced Accuracy

Precise modeling ensured that all elements were accurately represented, reducing the risk of errors during the construction process. This accuracy facilitated seamless project execution and ensured that the building was constructed according to the design specifications, minimizing costly rework and delays.

Improved Project Management

The BIM model facilitated better project management and coordination among different teams, leading to smoother project execution.

Enhanced Facility Management

The detailed asset data integrated into the BIM model supported ongoing facility management, providing essential information for maintenance, repairs and operational efficiency.

Conclusion

Clove Technologie's exceptional CAD to BIM services played a crucial role in the successful completion of this prestigious commercial office building. Our commitment to precision, collaboration and using advanced technology ensured that our client achieved their goals with utmost satisfaction.

Download
Download

If you intend to act, we are ready to help!