IFC Drawings in Construction: 12 Checks Before Releasing Drawings for Site Work

Created on:
October 26, 2026
 5.0
 153
 13
Contents:
What Are IFC Drawings in Construction?
12 Checks Before Releasing IFC Drawings
What Challenges Do Construction Teams Face?
How BIM Coordination Improves IFC Drawing Quality
How Clove Technologies Supports Collaborative Engineering
Frequently Asked Questions
Conclusion
image

IFC drawings help construction teams turn a design into a real building. They guide engineers, contractors, and site workers during construction. However, missing dimensions, outdated drawings, and poor coordination can lead to delays, rework, and extra costs.

Many construction problems begin before work starts on site. A pipe may clash with a beam. An updated wall layout may not reach every team. A contractor may use an old drawing by mistake.

The solution is not just to prepare IFC drawings. It is to check, coordinate, and control them before construction begins.

In this guide, we explain 12 important checks, common challenges, and how Clove Technologies can support better BIM coordination and collaborative engineering workflows.

What Are IFC Drawings in Construction?

IFC means Issued for Construction in this article. IFC drawings are documents released for construction use after the reviews and approvals required by the project.

They may include architectural plans, structural details, mechanical, electrical, and plumbing (MEP) layouts, dimensions, levels, and construction notes.

These drawings help site teams understand what to build and how different parts of a project should fit together.

12 Checks Before Releasing IFC Drawings

1. Check Drawing Numbers and Titles

Confirm that each drawing has the correct project name, number, title, discipline, and revision. This helps teams find the correct information.

2. Verify Dimensions and Levels

Review measurements, grid lines, floor levels, heights, and openings. Missing or conflicting dimensions can cause setting-out errors.

3. Confirm the Latest Revision

Check that the drawing includes the latest approved changes. Clearly identify outdated versions so site teams do not use them by mistake.

4. Coordinate Architecture and Structure

Compare walls, columns, beams, slabs, and openings. Check whether architectural layouts match the structural design.

5. Review MEP Coordination

Check ducts, pipes, cable trays, and other services against structural and architectural elements. Confirm that there is enough space for installation and maintenance.

6. Run BIM Clash Checks Where Applicable

Use coordinated BIM models to identify possible conflicts between building elements. Review the results with the responsible engineers before deciding which issues need correction.

7. Check Openings and Sleeves

Confirm the locations and sizes of penetrations for pipes, ducts, and cables. Required structural reviews must be completed before changing structural elements.

8. Review Notes and Specifications

Check material details, symbols, abbreviations, technical notes, and references against project requirements.

9. Verify Drawing References

Make sure section marks, detail numbers, and references point to the correct drawings. Incorrect references can confuse site teams.

10. Confirm Design Changes

Check that approved design changes appear in all affected drawings. A change in one discipline may also affect other teams.

11. Complete Required Reviews and Approvals

Follow the project’s review, approval, and document-control process. A shared file is not automatically ready for construction.

12. Check the Final Drawing Package

Confirm that the correct drawings, revisions, issue dates, and distribution records are included. Update the drawing register so everyone knows which documents are current.

What Challenges Do Construction Teams Face?

Challenge 1: Different Teams Work With Different Drawings

Architects, structural engineers, and MEP teams may update drawings at different times, leading to conflicting information.

How Clove can help: Collaborative engineering workflows and Digital Built services can help teams review design information, identify inconsistencies, and communicate changes before construction.

Challenge 2: Design Changes Are Missed

Revised drawings may not reach everyone who needs them, increasing the risk of work based on outdated information.

How Clove can help: Structured drawing reviews and revision-control workflows can help teams identify current drawing versions, track changes, and maintain clear project records.

Challenge 3: MEP Services Clash With Structural Elements

Ducts, pipes, and cable trays may compete for space around beams, ceilings, and walls.

How Clove can help: BIM coordination reviews and clash detection can help identify potential conflicts between building services and structural elements before installation, where suitable BIM models are available.

Challenge 4: Errors Are Found Too Late

Issues discovered during construction can lead to rework, extra material costs, and schedule delays.

How Clove can help: Reviewing model information, dimensions, drawing consistency, and coordination between disciplines can help teams identify issues earlier. Results depend on accurate inputs and proper engineering review.

Challenge 5: Project Information Is Difficult to Manage

Teams may struggle to find the correct drawing, check its revision status, or identify who needs to review it.

How Clove can help: Collaborative digital workflows can support organised information sharing, drawing reviews, and coordination across project teams.

How BIM Coordination Improves IFC Drawing Quality

Building Information Modeling (BIM) helps teams coordinate building information in a shared digital environment.

A well-managed BIM workflow can help teams:

  • Identify potential clashes between building elements.
  • Review design changes across different disciplines.
  • Improve consistency between coordinated models and drawings.
  • Share information more clearly.
  • Reduce avoidable errors before construction.

BIM does not remove every risk. Accurate models, clear responsibilities, and qualified engineering reviews remain essential.

How Clove Technologies Supports Collaborative Engineering

Clove Technologies provides digital engineering and BIM-related services that can help project teams manage design information and improve coordination.

By combining BIM coordination with structured reviews and collaborative workflows, teams can improve construction documentation and make better-informed project decisions.

Explore Clove Technologies’ collaborative engineering solutions to discuss your project requirements.

Frequently Asked Questions

What does IFC mean in construction?

It means Issued for Construction: drawings released for construction use under the project’s required review and approval process.

What is the difference between IFC drawings and shop drawings?

IFC drawings communicate the design requirements for construction. Shop drawings generally provide additional details for fabrication, assembly, or installation, depending on the project.

Can IFC drawings be changed after release?

Yes. Changes may be required because of design updates or site conditions. They should follow the project’s review, approval, and revision-control process.

How does BIM help with IFC drawings?

BIM can help teams coordinate disciplines, review design information, and identify potential conflicts before construction.

Who checks IFC drawings?

Depending on the project, architects, engineers, BIM coordinators, contractors, and authorised reviewers may be involved.

Conclusion

IFC drawings are most useful when they are accurate, coordinated, and properly controlled. Checking dimensions, confirming revisions, reviewing MEP clashes, and completing required approvals can help prevent avoidable construction problems.

With suitable BIM coordination and collaborative engineering workflows, project teams can identify issues earlier and improve the information used on site.

Need support with BIM coordination or collaborative engineering? Contact Clove Technologies to discuss your project needs.

Discover more of our innovative blogs

Residential Plan
Paper to CAD
Paper to CAD
October 13, 2025
Step-by-Step Guide to Paper to CAD Conversion
Residential Plan
Digital Twin vs BIM
Digital Twin vs BIM
September 29, 2026
Digital Twin vs BIM: How They Work Together in AEC and Building Operations
Residential Plan
Digital Construction
Digital Construction
May 27, 2026
AutoCAD for AEC Industry: Benefits, Applications & Future Trends
Residential Plan
SCAN TO BIM
SCAN TO BIM
December 17, 2024
TOP 5 BIM COMPANIES IN INDIA TO OUTSOURCE IN 2025

Let's Talk

Let’s discuss your requirements and see how our expertise can help on your next project.

Let's Get Started
Let's Get Started