BIM-MEP Coordination: Reducing Clashes Before Construction Begins

Think how many clashes can occur on a construction site if an HVAC duct crosses a structural beam, a Cable tray is placed where a plumbing pipe should be or where the sprinkler system can’t reach the ceiling.

All these issues can lead to installation delays, rework, scheduling conflicts between different areas of work, and increased costs of your project.

The problem is often not the construction itself. It is the lack of coordination before construction begins.

BIM-MEP coordination is a digital tool that helps to detect these conflicts before the system’s installation begins. It avoids potential issues during construction by examining and integrating various types of MEP data within the shared BIM platform.

The end result is not just another 3D model. The end result is a coordinated constructible building design